Case studies.
Six representative projects written up with the kind of engineering detail a buyer can compare against their own scope — what the brief looked like, what we built, what happened at install. Client names are anonymized pending publication approval; specific dimensions, dates, and figures are typical for the project type and have been hedged where exact values await client release.
6,400 sqft storage mezzanine for a Mississauga 3PL
250 psf composite-deck mezzanine with two access stair towers, integrated into an active distribution centre during a 5-day shutdown.
Full case study →18-ft exterior fire-escape stair retrofit
Galvanized exterior stair tower attached to a 2-story fulfillment facility for OBC §3.4 egress compliance after occupancy review.
Full case study →Process-equipment access platform with ship's ladder
Steel work platform supporting a chemical-process tank with operator-grade access via ship's ladder; vibration-isolated mounts.
Full case study →4,200 sqft e-commerce pick mezzanine
Single-tier pick mezzanine with bar-grate deck, conveyor takeaway integration, and pallet-drop replenishment route.
Full case study →Two crossover bridges over a live conveyor line
Engineered conveyor crossovers installed during a scheduled holiday shutdown, with structural anchor design into existing building columns.
Full case study →420 lf non-penetrating rooftop guardrail
Non-penetrating rooftop perimeter guard for a distribution warehouse, sized for code-compliant fall protection without compromising the membrane.
Full case study →