Same people, every project.
The engineering bench, the shop, and the install crew at Span Line are the same names from quote to handoff. No subcontracted engineering, no day-rate weld shop, no third-party install. The list below is who you'll work with.
Stamped by Ontario P.Eng.
Two licensed Professional Engineers registered with PEO produce and stamp every structural drawing that leaves our shop. Verify any P.Eng. licence number directly with the issuing body: PEO public licence lookup.
CWB-qualified fabrication, in-house install.
Welds are produced by CWB-qualified fabricators running CWB-qualified procedures. The shop foreman runs the fabrication queue and does the per-project weld traceability. The install crew is our crew — not subcontracted to a day-rate erector.
[Shop Foreman name pending]
Manages the fabrication queue, runs per-project weld traceability, and signs off on weld inspections before structural pieces leave the shop. The single point of accountability for shop quality.
[Install lead name pending]
Runs the install crew on every project. Coordinates shutdown windows with facility managers, leads the pre-install walk, and signs off the handoff with the building owner. Same person from project to project.
Span Line is small enough that the engineer who stamped your drawing is the engineer who's available when your facility manager has a question at install. The shop foreman who tracked your welds is the foreman on the install walk. There is no "your project manager" layer between you and the people doing the work — that's a deliberate structural choice, and it's why we keep delivery times tight and surprises rare.