Industrial mezzanines & steel stairs in Brantford.
Span Line builds and installs structural mezzanines, work platforms, and steel stairs for Brantford's distribution and manufacturing base — the Braneida Industrial Park and the Highway 403 corridor.
In short: We're an Ontario fabricator serving Brantford with mezzanines, platforms, and stairs, stamped to OBC 2024. Brantford is about an hour down the 403, within our install range, with shipping for supply-only orders.
- From our shop to Brantford~1 hr via 403
- Typical mezzanine lead time4 – 8 weeks from sign-off
- Typical stair lead time3 – 6 weeks from sign-off
- DrawingsP.Eng.-stamped to OBC 2024, in-house
For Braneida and the 403.
Brantford has grown into a real distribution and manufacturing node on the 403 between the GTA and southwestern Ontario — the Braneida Industrial Park, the Brantford Business Park, and the newer logistics developments drawing major food and consumer-goods operations. Big, tall distribution buildings are exactly the profile where storage mezzanines and multi-tier decks make more of the footprint.
At about an hour down the 403, Brantford is within our install range for measures and set, and modular bolt-together detailing covers supply-only orders. The engineering and CWB weld standards are the same as everything else we ship — stamped to OBC 2024 for the Brantford permit.
Steel that solves a floor problem.
Storage mezzanines
Recover cube over racking or open floor — 125–500 psf decks for pallet and case storage.
Work platforms
Pick modules, pack-out decks, and value-add stations with conveyor pass-throughs.
Equipment platforms
Elevated support for HVAC, process equipment, and conveyor drives.
Egress & access stairs
Code-required exit stairs and mezzanine access towers to OBC §3.4.6.
Guardrails & handrails
42" industrial guarding, mezzanine edge protection, and pallet-drop gates.
Catwalks & access
Service walkways and crossovers over lines and equipment.
Measure, stamp, build, install.
-
01
Site measure
A ~30-minute visit to capture clear heights, column grid, and slab capacity — Brantford's newer distribution boxes often open up multi-tier options.
-
02
Stamped drawings
Engineered and P.Eng.-stamped to OBC 2024 in-house — the set the City of Brantford Building Division needs for the permit.
-
03
In-house fabrication
Cut, welded, and finished at our shop to CWB W47.1 — not white-labelled out. Galvanizing or shop primer as the environment calls for.
-
04
Install or supply
On most Brantford projects we install with our own crew down the 403; for supply-only orders we ship contractor-ready with erection drawings.
See the full engineering & install process for how each stage is controlled.
Span Line Systems is the industrial mezzanine and stair division of Art Metal Canada. Drawings are stamped by a PEO-licensed P.Eng. on staff; welding is done to CWB W47.1 and CSA W59 by our own certified fabricators. We don't white-label the fabrication or subcontract it out — the shop that draws it builds it.
- WeldingCWB W47.1 · CSA W59
- Structural codeOBC 2024 · NBCC §4.1.5
- EngineeringPEO-licensed P.Eng., stamped in-house
- ParentArt Metal Canada
Straight answers.
Which Brantford areas do you cover?
Do you install in Brantford or only ship?
Can you build multi-tier mezzanines in Brantford's newer warehouses?
We serve the 403 corridor — Hamilton, Cambridge, Woodstock, Guelph — and ship province-wide. See the full service-area map or tell us the span.