Toronto · Ontario · Shipping Canada-wide
QUOTES RETURNED IN ≤ 24 HRS · (647) 360-7079
Home/Service Areas/Burlington

Industrial mezzanines & steel stairs in Burlington.

Span Line builds and installs structural mezzanines, work platforms, and steel stairs for Burlington's manufacturing and distribution base — the Harvester Road and Mainway industrial areas along the QEW and 407.

CWB W47.1 certified OBC 2024 P.Eng. stamped in-house Install across the GTA
Structural steel mezzanine installed in a Burlington manufacturing facility

In short: We're an Ontario fabricator serving Burlington with mezzanines, platforms, and stairs, stamped to OBC 2024. The shop is ~40 minutes down the QEW, so Harvester Road and Mainway sites get scheduled measures and installs by our own crew.

  • From our shop to Burlington~40 min via QEW
  • Typical mezzanine lead time4 – 8 weeks from sign-off
  • Typical stair lead time3 – 6 weeks from sign-off
  • DrawingsP.Eng.-stamped to OBC 2024, in-house

For Harvester Road and Mainway.

Burlington carries a diverse industrial base — manufacturing, food, and distribution across the Harvester Road corridor, Mainway, and the north Aldershot area, tucked between the QEW, 403, and 407 and next door to Hamilton's industrial weight. It's a mix of established manufacturing buildings and distribution space, each with its own platform and access needs.

That variety means we're as likely to build an equipment platform or a work deck in a Burlington plant as a straightforward storage mezzanine in a warehouse. The QEW keeps the city within an easy install run of the shop, so measures and installs stay on a tight schedule.

Measure, stamp, build, install.

  1. 01

    Site measure

    A ~30-minute visit to capture the footprint, clear heights, access, and slab condition across Burlington's mixed building stock.

  2. 02

    Stamped drawings

    Engineered and P.Eng.-stamped to OBC 2024 in-house — the set the City of Burlington Building & By-law Department needs for the permit.

  3. 03

    In-house fabrication

    Cut, welded, and finished at our shop to CWB W47.1 — not white-labelled out. Galvanizing or shop primer as the environment calls for.

  4. 04

    Install on your window

    Sequenced to your operating schedule and installed by our own crew across the Harvester Road, Mainway, and Aldershot industrial areas.

See the full engineering & install process for how each stage is controlled.

// Who builds it

Span Line Systems is the industrial mezzanine and stair division of Art Metal Canada. Drawings are stamped by a PEO-licensed P.Eng. on staff; welding is done to CWB W47.1 and CSA W59 by our own certified fabricators. We don't white-label the fabrication or subcontract it out — the shop that draws it builds it.

  • WeldingCWB W47.1 · CSA W59
  • Structural codeOBC 2024 · NBCC §4.1.5
  • EngineeringPEO-licensed P.Eng., stamped in-house
  • ParentArt Metal Canada

Straight answers.

Which Burlington areas do you cover?
The Harvester Road corridor, Mainway, north Aldershot, and the wider QEW/403 industrial belt.
Do you build both storage mezzanines and equipment platforms in Burlington?
Yes. Given Burlington's mix of manufacturing and distribution, we build storage decks, work platforms, and equipment-support platforms — plus the stairs and guarding that come with them.
How quickly can you get to a Burlington site?
Usually within a few business days — the shop is about 40 minutes down the QEW.

We cover the west GTA and Golden Horseshoe — Oakville, Hamilton, Milton, Mississauga — and ship province-wide. See the full service-area map or tell us the span.

Tell us the span. We'll send numbers back within 24 hours.

Quick quote form or a direct call — whatever fits. Ontario warehouses only; we handle delivery Canada-wide.