Toronto · Ontario · Shipping Canada-wide
QUOTES RETURNED IN ≤ 24 HRS · (647) 360-7079

Industrial mezzanines & steel stairs in Milton.

Span Line engineers and installs structural mezzanines, work platforms, and steel stairs for Milton's fast-growing distribution sector — the Milton Business Park and the 401/407 logistics corridor.

CWB W47.1 certified OBC 2024 P.Eng. stamped in-house Install across the GTA
Multi-tier storage mezzanine in a tall Milton distribution warehouse

In short: We're an Ontario fabricator building mezzanines, platforms, and stairs for Milton's distribution and 3PL operations, stamped to OBC 2024. The shop is ~35 minutes away via the 401 and 407, so Milton Business Park sites get quick measures and installs by our own crew.

  • From our shop to Milton~35 min via 401 & 407
  • Typical mezzanine lead time4 – 8 weeks from sign-off
  • Typical stair lead time3 – 6 weeks from sign-off
  • DrawingsP.Eng.-stamped to OBC 2024, in-house

For the 401/407 logistics corridor.

Milton has become one of the GTA's fastest-growing distribution nodes — big-box warehousing across the Milton Business Park and the employment lands at the 401/407 interchange, with major rail-served logistics on the way. The buildings are new and tall, which is exactly the profile where a storage mezzanine or a multi-tier deck can double usable floor without touching the building envelope.

High clear heights reward going up. A tall Milton distribution box is often the ideal candidate for a multi-tier mezzanine or a deep storage deck, and from Etobicoke the site is a straightforward run down the 401 and 407 for measures and install.

Measure, stamp, build, install.

  1. 01

    Site measure

    A ~30-minute visit to capture clear heights, column grid, and slab capacity — Milton's tall new boxes often open up multi-tier options.

  2. 02

    Stamped drawings

    Engineered and P.Eng.-stamped to OBC 2024 in-house — the set the Town of Milton Building Services needs for the permit.

  3. 03

    In-house fabrication

    Cut, welded, and finished at our shop to CWB W47.1 — not white-labelled out. Galvanizing or shop primer as the environment calls for.

  4. 04

    Install on your window

    Sequenced into your operation and installed by our own crew across the Milton Business Park and the 401/407 employment lands.

See the full engineering & install process for how each stage is controlled.

// Who builds it

Span Line Systems is the industrial mezzanine and stair division of Art Metal Canada. Drawings are stamped by a PEO-licensed P.Eng. on staff; welding is done to CWB W47.1 and CSA W59 by our own certified fabricators. We don't white-label the fabrication or subcontract it out — the shop that draws it builds it.

  • WeldingCWB W47.1 · CSA W59
  • Structural codeOBC 2024 · NBCC §4.1.5
  • EngineeringPEO-licensed P.Eng., stamped in-house
  • ParentArt Metal Canada

Straight answers.

Which Milton areas do you cover?
The Milton Business Park and the employment lands around the 401/407 interchange, plus the newer logistics developments across the town.
Can you build multi-tier mezzanines in Milton's tall warehouses?
Yes — Milton's high clear heights are ideal for multi-tier decks and deep storage mezzanines that maximise cube. We size the tiers to your clear height and slab capacity.
How fast can you reach a Milton site?
Usually within a few business days. The shop is about 35 minutes away via the 401 and 407, so measures and installs schedule quickly.

We cover Halton and the west GTA — Oakville, Burlington, Mississauga, Georgetown — and ship province-wide. See the full service-area map or tell us the span.

Tell us the span. We'll send numbers back within 24 hours.

Quick quote form or a direct call — whatever fits. Ontario warehouses only; we handle delivery Canada-wide.