Toronto · Ontario · Shipping Canada-wide
QUOTES RETURNED IN ≤ 24 HRS · (647) 360-7079

Industrial mezzanines & steel stairs in Vaughan.

Span Line engineers and installs structural mezzanines, pick decks, and steel stairs for Vaughan's distribution and e-commerce sector — Concord, Woodbridge, and the Vaughan Enterprise Zone around the 400, 407, and 427.

CWB W47.1 certified OBC 2024 P.Eng. stamped in-house Install across the GTA
E-commerce pick mezzanine with bar-grate deck in a Vaughan distribution centre

In short: We're an Ontario fabricator building mezzanines, pick platforms, and stairs for Vaughan's distribution and e-commerce operations. The shop is ~25 minutes away via the 427 and 407, so Concord, Woodbridge, and Enterprise Zone sites get quick measures and installs, stamped to OBC 2024.

  • From our shop to Vaughan~25 min via 427 & 407
  • Typical mezzanine lead time4 – 8 weeks from sign-off
  • Typical stair lead time3 – 6 weeks from sign-off
  • DrawingsP.Eng.-stamped to OBC 2024, in-house

For the Enterprise Zone.

Vaughan runs on movement — Concord and Woodbridge industrial, the Vaughan Enterprise Zone, and the freight funnel around CN's MacMillan Yard, all fed by the 400, 407, and 427. It's distribution, e-commerce fulfillment, and building-materials country, where recovering deck space and adding pick capacity is a constant pressure against a fixed building footprint.

That's the sweet spot for a pick mezzanine or a storage deck with a pallet drop — get the picking up off the floor, keep the takeaway moving. From Etobicoke a Vaughan site is a short run up the 427, so measures and installs schedule fast, and we sequence around the peak-season windows that fulfillment operations live by.

A 4,200 sqft e-comm pick deck.

For a Vaughan e-commerce operation we built a 4,200 sqft pick mezzanine with a bar-grate deck and a counter-balanced pallet drop — picking lifted off the floor, replenishment flowing through the drop, all sequenced around the run-up to peak. Pick decks are about flow as much as structure: the deck elevation, the drop location, and the stair placement all follow how product actually moves.

Read the full case study →
// Project spec
  • TypeE-comm pick mezzanine
  • Deck4,200 sqft, bar-grate
  • FeatureCounter-balanced pallet drop
  • SectorE-commerce fulfillment
  • LocationVaughan, ON

Measure, stamp, build, install.

  1. 01

    Site measure

    A ~30-minute visit to capture column centres, clear heights, and — for a pick deck — how product and people actually flow. Quick to schedule from Etobicoke.

  2. 02

    Stamped drawings

    Engineered and P.Eng.-stamped to OBC 2024 in-house — the set the City of Vaughan Building Standards Department needs for the permit.

  3. 03

    In-house fabrication

    Cut, welded, and finished at our shop to CWB W47.1 — not white-labelled out. Galvanizing or shop primer as the environment calls for.

  4. 04

    Install on your window

    Sequenced around your operation — often the shoulder before a peak season — and installed by our own crew across Concord, Woodbridge, and the Enterprise Zone.

See the full engineering & install process for how each stage is controlled.

// Who builds it

Span Line Systems is the industrial mezzanine and stair division of Art Metal Canada. Drawings are stamped by a PEO-licensed P.Eng. on staff; welding is done to CWB W47.1 and CSA W59 by our own certified fabricators. We don't white-label the fabrication or subcontract it out — the shop that draws it builds it.

  • WeldingCWB W47.1 · CSA W59
  • Structural codeOBC 2024 · NBCC §4.1.5
  • EngineeringPEO-licensed P.Eng., stamped in-house
  • ParentArt Metal Canada

Straight answers.

Do you build e-commerce pick decks in Vaughan?
Yes — pick mezzanines with bar-grate decks, pallet drops, and conveyor pass-throughs are common here given Vaughan's fulfillment base. We design the deck around product flow, not just the load.
Which Vaughan areas do you cover?
Concord, Woodbridge, Maple, and the Vaughan Enterprise Zone — the whole industrial belt around the 400, 407, and 427.
Can you install before a peak season without stopping operations?
Yes. We routinely stage installs into the shoulder before peak and sequence the steel into off-shift or shutdown windows so the operation keeps running.

We cover the north and west GTA — Toronto, Markham, Richmond Hill, Brampton — and ship province-wide. See the full service-area map or tell us the span.

Tell us the span. We'll send numbers back within 24 hours.

Quick quote form or a direct call — whatever fits. Ontario warehouses only; we handle delivery Canada-wide.